Seven Bridges Road (Amity Creek)

Occidental Boulevard at Superior Street, climbing Amity Creek to Skyline Parkway, Duluth, MN 55804

3 miLength
paved road with stone arch bridgesSurface
easyDifficulty
open to vehicles seasonally, closed in winter; walking and skiing year-roundSeason
Trails

About Seven Bridges Road (Amity Creek)

Seven Bridges Road climbs Amity Creek from the western edge of Lester Park to Skyline Parkway, crossing and recrossing the stream on stone arch bridges the whole way. It is the eastern terminus of Duluth's boulevard system and one of the best short drives, walks, or bike climbs in the region.

Samuel Snively, a land developer who later became Duluth's longest-serving mayor, donated and assembled the land and built the original road, which opened to the public in 1901 carrying nine wooden bridges. Within a decade it had fallen apart, and the city parks board rebuilt it, reopening in 1912 as Amity Parkway with nine new stone-arch bridges (Duluth News Tribune, accessed 2026-08-13). The name has never matched the count, and locals will tell you so.

Amity Creek runs beside the road the entire way, with small falls, chutes, and swimming holes at intervals. The road closes to vehicles for the winter, which turns it into a walking and skiing route and is when residents like it best. Pullouts are small and the shoulders are narrow, so park at Lester Park and walk up if the lot at the top is full.

Good to know: nine stone arch bridges, Amity Creek waterfalls, swimming holes, eastern terminus of Skyline Parkway, seasonal vehicle closure.

Access: Superior Street at Lester Park, or from Skyline Parkway at the top

Seasonal access and trail conditions change. Check current conditions before you go.
Nearby

Neighborhoods it serves

Sources

Where these facts come from

Last reviewed 2026-08-13 by Guide editorial.

See something wrong on this page? Tell us.

Optional email, only used to follow up on this report.